Posted by grim (206.162.192.40) on July 30, 2003 at 05:37:45:
A pair of the "principle pieces" has been completed for a while.
Work has been priority lately, but am getting back to it. All that's left is to locate two suitable roller bearings and
fabricate a bracket to mount them, no biggie compared to the two machined pieces.
Lead weights not used in this one, its based upon 2 1/2 lb. barbell weights that can be tandemed for greater weight if needed.
A one-pair setup should determine if the slop model will scale up wih no probs.
Regards
grim